Use this article to install a Bullhorn RM520 bond monitor on a test station, and to wire the unit and its REL2502 relay.
Applies to: Bullhorn RM520C and RM520S.
Steps
- Remove the test station cap. Uncouple the test head from the riser post. Do not break the structure or reference cell connections.
- Feed the leads from the Pipe 1 and Pipe 2 terminals of the REL2502 relay up through the base of the test head. Attach Pipe 1 to the test head bolt for your structure. Attach Pipe 2 to the bolt for the foreign structure.
- Route the whole RM520 wiring cable up through the base of the test head.
- Feed the relay's mounting tab up through the base of the test head. Secure it to the back of the test head plate with three panel nuts.
- Connect the unit leads of the wiring cable to the test head bolts. Black (Pipe 1) goes to your structure. White (Pipe 2) goes to the foreign structure. Yellow (Reference Cell 1) goes to the permanent reference cell. Orange (Reference Cell 2) goes to a second reference cell, if the site has one.
- Attach the RM520 mounting bracket to the top of the test head's vertical plate with a 1/4-20 bolt.
- Install the two test station cap spacers on the test head. Hand tighten them.
- Recouple the test head to the riser post, with the relay hanging inside the riser post. Check that every connection is still intact.
- Snap the two terminal blocks of the wiring cable together. Press them onto the unit's pins until the pins are fully covered.
- Remove the Phillips screw from the back of the unit. Fit the unit over the top of the vertical plate. Secure it to the mounting bracket with that screw.
- Wake the unit. Swipe a magnet near the icon on the unit's label and wait for the blue LED to turn off. Swipe again. When the LED blinks, Bluetooth pairing is on.
- Open the Bullhorn FieldPro app. Select the unit and tap OK. Wait until Signal Quality, Lat and Lon show valid values.
- Open Test Message, turn on Auto Refresh and tap Send Test Message. Wait for "Transmission Successful". This can take several minutes.
- Test the relay. Open Interruption. Set Interruption Mode to Interruption On, Output Mode to Normally Closed and Cycle Begins With to On. For this test only, set On Time to 3 seconds and Off Time to 1 second. Tap Update. Read the relay's current output with a voltmeter to confirm the current is switching.
- Set Interruption Mode back to Interruption Off and tap Update.
- Put the test station cap back on. Then configure the unit for service.
Wiring
| Wire label | Wire color | Connects to |
|---|---|---|
| Pipe 1 | Black | Your structure (Structure 1 on the test head) |
| Pipe 2 (Foreign) | White | The foreign structure (Structure 2 on the test head) |
| Reference Cell 1 (Ref 1) | Yellow | Permanent reference cell (Reference Electrode on the test head) |
| Reference Cell 2 (Cal/Ref 2) | Orange | Second permanent reference cell, or a portable one |
| Relay Ctrl + | Blue | REL2502 relay control (+) |
| Relay Ctrl - | Blue/white | REL2502 relay control (-) |
| Shunt + | Purple | REL2502 shunt (+) |
| Shunt - | Purple/white | REL2502 shunt (-) |
The official wiring diagrams are on the Bullhorn support site:
- Triton test station
- Other test station, 1 reference cell
- Other test station, 2 reference cells
- Other test station, 1 reference cell and an external shunt
- Other test station, 2 reference cells and an external shunt
Good to know
- The RM520 is the Bullhorn bond monitor. It is made for single-bond sites, where your structure is bonded to a foreign structure.
- It installs on a test station with a 3 inch riser post and a test head with one or two reference cells. It fits Triton test stations and other test stations.
- The REL2502 relay comes with the unit. The RM520 needs it to interrupt the bond. The relay has a built-in 20 A shunt. The maximum input current is 20 A.
- Always keep Pipe 1 on the relay connected to Pipe 1 on the unit (black wire). Always keep Pipe 2 on the relay connected to Pipe 2 on the unit (white wire).
- Bond current sign: a positive value means current flows from Pipe 2 to Pipe 1. A negative value means current flows from Pipe 1 to Pipe 2.
- If the test station has its own shunt and you want to use it, the wiring changes. Use the "external shunt" diagrams above.
- The site needs a clear line of sight to the sky. The RM520C is cellular. The RM520S is satellite.
- Tools: Phillips #1, #2 and #3 screwdrivers, a flathead screwdriver, an adjustable wrench, a voltmeter, a 3/8 inch hex socket wrench, 7/16 and 3/8 inch combo wrenches, a magnet, and a phone or tablet with Bluetooth and the FieldPro app.
- For batteries, see the article "Bullhorn RM520 and RM540: Battery Life and Battery Replacement".
- This article is for the RM520 only. The RM510C and RM510S install on a rectifier. See the article "RM5 Wiring Diagram Overview".
Please follow your company's safety checklist when you work on this equipment.
When to contact support
- Signal Quality, Lat or Lon never show valid values, or the test message does not succeed. First see the article "Bullhorn RM520 and RM540: Not Communicating After Install".
- The relay does not switch in the test. First see the article "Bullhorn RM520 and RM540: Will Not Interrupt or No Instant Off Reading".
- Your test station does not match any of the diagrams.