(AI KB) Bullhorn RM540: Install on a Test Station and Wiring Diagram

Use this article to install a Bullhorn RM540 test point monitor on a test station, and to wire it.

Applies to: Bullhorn RM540C and RM540S.

Steps

  1. Remove the test station cap from the test head.
  2. Attach the leads of the RM540 wiring cable to the test head bolts. Gray (Pipe 1) goes to the structure. Yellow (Ref 1) goes to the permanent reference cell. Orange (Cal/Ref 2) goes to a second reference cell, if the site has one.
  3. Install the test head spacer on the test head. Hand tighten it.
  4. Press the wiring cable terminal block onto the unit's pins until no pins are exposed.
  5. Check that every connection is secure and the wires are intact.
  6. Remove the Phillips screw from the back of the unit. Fit the unit over the top of the test head's vertical plate. Secure it with that screw.
  7. Wake the unit. Swipe a magnet near the icon on the unit's label and wait for the blue LED to turn off. Swipe again. When the LED blinks, Bluetooth pairing is on.
  8. Open the Bullhorn FieldPro app. Select the unit and tap OK. Wait until Signal Quality, Lat and Lon show valid values.
  9. Open Test Message, turn on Auto Refresh and tap Send Test Message. Wait for "Transmission Successful". This can take several minutes.
  10. Put the test station cap back on. Then configure the unit for service.

Wiring

Wire label Wire color Connects to
Pipe 1 Gray The structure, at the test head
Ref 1 Yellow Permanent reference cell
Cal/Ref 2 Orange Second permanent reference cell, or a portable one

The official pictures are on the Bullhorn support site: RM540 system overview and RM540 wiring cable connections.

Good to know

  • The RM540 is a battery-powered test point monitor. It sits on the test head.
  • The RM540 does not use a dome, an RM5 I/O 4 module, an RM5 power supply or a relay. Those parts belong to the RM510C and RM510S, which install on a rectifier.
  • The RM540 has no relay. It is Interruption Aware: it can be given an interruption schedule so that it takes instant on and instant off readings in step with the units that interrupt.
  • It installs on a test station with a 3 inch riser post and a test head with one or two reference cells. It fits Triton test stations.
  • The site needs a clear line of sight to the sky. The RM540C is cellular. The RM540S is satellite.
  • Tools: Phillips #1, #2 and #3 screwdrivers, a flathead screwdriver, an adjustable wrench, a voltmeter, a 3/8 inch hex socket wrench, 7/16 and 3/8 inch combo wrenches, a magnet, and a phone or tablet with Bluetooth and the FieldPro app.
  • For batteries, see the article "Bullhorn RM520 and RM540: Battery Life and Battery Replacement".

Please follow your company's safety checklist when you work on this equipment.

When to contact support

  • Signal Quality, Lat or Lon never show valid values, or the test message does not succeed. First see the article "Bullhorn RM520 and RM540: Not Communicating After Install".
  • Your test station does not have a place for one of the wires.

Was This Article Helpful?

0 out of 0 found this helpful